Friday, August 1, 2025

Power System Protection

 Requirements of Power System Protection

1. Fast: Fast operation in order to clear the fault from the system and minimize system damage.

2. Reliable: Work when required, and only when required. Protective equipment should not fail to operate in the events of fault in the protected zone.

3. Stable: To leave all healthy circuits intact and ensure continuity of supply.

4. Selective: Disconnection of equipment is restricted to the minimum necessary to isolate the fault.

5. Sensitive: Sensitive enough to operate under minimum fault condition.


Type of Protection

A. Unit Protection

1. Operates on differential principle, Kirchhoff’s current law

2. Discrimination by a defined ‘zone protection’ determined by CT

3. Must be stable during external fault

4. Fast operating time, typical:20-50ms

5. Main protection system

6. Example: 

- Line/Transformer/Busbar differential, Restricted Earth Fault

- Defined by CT position




Non-Unit Protection: Overcurrent & Earth Fault protection

B. Non-Unit Protection

1. No defined area of coverage

2. Simple and cheaper

3. Slower operating time

4. Backup protection system

5. Discrimination by time factor

6. Requires time coordination between various stages

7. Example: 

a. OCEF

-Time-delayed/IDMT: Can range from a few hundred milliseconds to several seconds, 

-Depending on coordination with up/downstream devices.

b. SBEF (2000-5000ms)


Typical Protection Scheme for Cable


1. The cheapest protection relay compared to differential protection, REF etc.

2. Use standard characteristics:

a. Definite Time (DT)

b. Standard/ Normal Inverse (SI/NI)

c. Very Inverse (VI)

d. Extremely Inverse (EI)

e. Long Time Inverse (LTI)


Inverse Definite Minimum Time Characteristic (IDMT)

1. The relay operating time varies inversely with the magnitude of the fault current.

2. This means that the higher the fault current, the faster the relay will operate.

3. In contrast to definite-time relays, which have a fixed time delay, the operating time of inverse-time relays is dependent on the severity of the fault.


4. Normal Inverse characteristic


5. Normal Inverse calculation example

6. Calculation using website.
https://myelectrical.com/tools/idmt-tripping-time



7. IDMT Relay Operating Time

8. ANSI Device Function Numbers


Note refer from: Ir. Jamil Ahmad Radziyan (Warna RS Sdn Bhd) 









Thursday, March 18, 2021

AutoCAD-Plot Setup & Publish (Lesson Learn)

 Harini nak share sikit berkenaan AutoCAD. cara nak buat plot setup & publish. step ni amat penting sekiranya kita perlu print menggunakan AutoCAD yang bilangan sheet yang banyak. Ambil masa yang lama kalau nak print satu persatu dalam model. 

Langkah ni, amat menjimatkan masa samada print terus ke printer ataupun print convert ke PDF. Selamat mencuba



































Wednesday, March 10, 2021

HV Short Circuit Calculation

 Bagaimana nak kira Short Circuit Calculation untuk High Voltage? penulisan ini mungkin akan diperbaiki dari masa ke semasa. harap ada yang menegur jika salah.

Fault dari source akan melalui semua peralatan (contohnya Transformer, Kabel) kepada fault point. Value fault / short circuit adalah bergantung kepada value Voltage dan Impedance dari source hingga ke fault Point. Lagi tinggi impedance, lagi rendah fault/ short circuit current rating. sebaliknya kalau rendah impedance, maka akan tinggi fault value. 

Perbezaan unit antara Fault Level dengan Short circuit current untuk kita tahu adalah seperti berikut:-

    Fault level: unit = MVA

    Short circuit current: unit = kA


Contoh SLD, menunjukan kedudukan Fault 1, Fault 2, Fault 3

Step 1: Calculate Impedance untuk Generator, Transformer, Cable



Step 2: Calculated Fault di lokasi terbabit. Value ini adalah value minimum fault. 3 phase & 1 phase. 




sekian: 

updated pada 10.03.2021

Friday, June 19, 2020

HV MV Cable carrying capacity




HV, MV cable carrying capacity:-
1.132kV 800mmsq, 1circuit=110MW*,2circuit=220MW* (copper)
2.33kV 630mmsq=27MW* (aluminium)
2a. 33kV 630mmsq=34MW*(copper)
3.11kV 800mmsq=12MW* (aluminium)
4.11kV 500mmsq=8MW* (aluminium)
5.11kV 240mmsq=5MW* (aluminium)
6.11kV 150mmsq=4MW* (aluminium)

*Mega Watt (MW) indicated as for reference. actual value need to refer cable manufacturer details.



Tuesday, November 19, 2019

How to determine Substation Voltage Drop & Short Circuit using Per Unit Calculation

Per unit system as a basis for calculation

Select 100MVA Base

All impedance, voltage and currents  & power flows are converted to Per unit

Express all Quantities in Dimensionless Units

Lets Start the calculation:-

Step No.1:-



Step No.2:-



Step No.3:-



 Step No.4:-



 Step No.5:-




 Step No.6:-
  calculate for 33kV system



 calculate for 11kV system



Single Line Diagram

Friday, January 18, 2019

Voltage Drop

Whatever or how perfect the conductivity of a cable, we will still faced a voltage drop problem caused by natural characteristics, which the impedance exist along the cable when convey currents. Based on certain resource, the voltage drop from the origin source must not be more than 4% of the supply.

Consequently, if we need to deliver supply to long distance, voltage drop calculation must be considered. This will help us to choose the appropriate cable’s size for our design, and to avoid the voltage drop more than 4%.

For this topic, I have approached formulas for the appropriate calculation on voltage drop. What I can conclude from this study is shown below:

VOLTAGE DROP
  • Cause by impedance exist in cable
  • Can be ignored if the cable length is short

Maximum voltage drop tolerate is 4%:
(a)    For three phase = 415 x 0.04 = 16.6V
(b)    For single phase = 240 x 0.04 = 9.6V


Voltage Drop = (M.D x D x mV/A/m)
                                        1000

Where:    M.D is Maximum Demand (Ampere)
                 D is Distance (meter)
mV/A/m is milivolts / A / meter which is cable impedance value obtain from IEE cable voltage drop Table


 


 Voltage drop from EMSB to ESSB-LP:
               Maximum Demand (MD)      =           600A
               Distance (D)                           =          30m
   mV/A/m                              Z =          0.175 mV/A/m
          (for 4/1C 400mm2 XLPE/PVC cable. Refer to Table4E1B)       

Voltage Drop      = (MD x D x mV/A/m)
                                            1000
                           = 600A x 30m x 0.175
                                             1000
                            = 3.15V


% Voltage Drop  = 3.15V x 100

                                   415V
                            = 0.76%




Voltage drop from ESSB-LP to SUBMAIN 5:
               Maximum Demand (MD)  =           200A
               Distance (D)                       =          75m
mV/A/m                             Z =          0.45 mV/A/m
(for 1 x 4C 95mm2 XLPE/ PVC cable. Refer to Table4E1B)
Voltage Drop      = (MD x D x mV/A/m)
                                            1000
                              = 200A x 75m x 0.45
                                             1000
                              = 6.75V

% Voltage Drop = 6.75V x 100
                                             415V
                              = 1.626%



IEE Wiring Regulations (17th Edition)


Friday, January 5, 2018

Kaedah Merekabentuk Sistem Perlindungan Kilat (IEC 62305 of Lightning Protection Standards)

Sistem Perlindungan Kilat? Macam mana nak rekabentuk sistem perlindungan kilat mengikut standard?
Di sini saya ingin berkongsi berkenaan dengan rekabentuk sistem perlindungan kilat. Seringkali melihat masih terdapat rekabentuk dari sesetengah jurutera yang masih tidak mematuhi rekabentuk berdasarkan IEC 62305. Mari kita lihat dan belajar dari panduan didalam IEC 62305.

1. Kaedah rekabentuk menggunakan kaedah Rolling sphere method (Non Isolated, Air Termination)

2. Memilih kelas Perlindungan Sistem Kilat yang diperlukan. Kebiasaanya, perekabentuk memilih kelas III kerana faktor ianya memadai dari segi perlindungan ke atas bangunan dan mengambikira kekangan kos.

3.  Membuat kiraan jarak antara Rod/Air Terminal yang diperlukan berdasarkan keterangan berikut:-
            Radius, r = 45 meter
            Height of rods, h = 0.5 meter
            So that, the distance between two (2) rods, d = 13.37 meter

4. Jika terdapat peralatan yang ingin dilindungi diatas bumbung contohnya seperti panel Solar, kiraan 'Penetration' perlu dijalankan berdasarkan keterangan berikut:-
Radius, r = 45m
Distance between the two rods, d = 10.37m
So that, the penetration distance = 0.299 m
        

5. Kedudukan Air Terminal adalah seperti berikut:-
6. Jarak antara Down Conductor adalah seperti berikut:-

7. Sistem pembumian. nilai bacaan rintangan adalah perlu kurang dari 10 ohm. Terdapat dua (2) kaedah pembumian yang boleh digunakan iaitu:-

Mudah kan? Kalau ikuti langkah-langkah yang dinyatakan, Insyallah sistem rekabentuk anda adalah mematuhi standard IEC62305 dan anda jangan terkejut jika mendapati ianya amat berbeza dengan apa yang terdapat di dalam lukisan pembinaan ataupun sistem perlindungan kilat yang telah dipasang di tapak ataupun di atas bumbung Apartment rumah anda.