Komponen Elektrik

MCCB – Moulded Case Circuit Breaker
·        Protection against Overload (Thermal Tripping) and Short Circuit (Magnetic Tripping)
-        Thermal tripping (overload) normally can set at 50%, 75%, 100%
-        Magnetic tripping (short circuit) can set for Icu, Ics
·        Standard Rating: 16A, 20A, 25A, 32A, 40A, 50A, 63A, 80A, 100A, 125A, 160A, 200A, 250A, 320A, 400A, 500A, 630A, 800A, 1000A, 1250A, 1600A
·        Pole: 1, 2, SPN, 3, 4, TPN
·        Category: A (no short circuit trip delay), B (in built time delay maybe adjustable): 125A to 1600A
·        Breaking Capacity: 
-        Icu: Ultimate short circuit capacity
-        Ics: Service short circuit breaking capacity
-        Icw: Short time withstand current (0.05 – 0.1 – 0.25 – 0.5 – 1s)
·        Energy liminating class: 1 (no limit), 2 (370 kA²s), 3 (110 kA²s)
·        Example write-up in the drawing:


MCB – Miniature Circuit Breaker
·        MCBs provide overcurrent and short-circuit protection only and are unable to detect residual current (earth leakage current) unless it is large enough to be classed as an overload or short circuit.
·        IEC 60898 (domestic/unsupervised) & IEC 609947-2 (industry/supervised)
·        Standard Rating: 0.5A, 1A, 2A, 3A, 4A, 6A, 10A, 16A, 20A, 25A, 32A, 40A, 50A, 63A, 80A, 90A, 100A, 125A
·        Breaking Capacity: 3 – 25kA
·        Pole: 1, 2, 3, 4
·        Magnetic Trip Type: B (socket), C (lighting, fan), D (Aircond, motor, sodium lighting)
·      Type B MCBs react quickly to overloads, and are built to trip when the current passing through them is between 3 and 4.5 times the normal full load current. They are suitable for protecting incandescent lighting and socket-outlet circuits in domestic and commercial environments, where there is little risk of current surges of a magnitude that could cause the MCB to trip.
·   Type C MCBs react more slowly, and are recommended for applications involving inductive loads with high inrush currents, such as fluorescent lighting installations. Type C MCBs are built to trip at between 5 and 10 times the normal full load current.
·   Type D MCBs are slower still, and are set to trip at between 10 and 20 times normal full load current. They are recommended only for circuits with very high inrush currents, such as those feeding transformers and welding machines.
Type K MCBs are designed to trip at between 8 and 12 times normal full load current, placing them between the traditional
Type C and Type D breakers. In most cases, they allow improved cable protection to be provided in circuits that include motors, capacitors and transformers, where it would previously have been necessary to use Type D devices. This enhanced protection is achieved without increasing the risk of nuisance tripping.
·        Energy liminating class: 1 (no limit), 2 (370 kA²s), 3 (110 kA²s)
·        Example write-up in the drawing:


RCD – Residual Current Device
·       Intended principally to minimise the risk of injury from electric shock, RCCBs provide protection against residual (earth leakage) currents only, and are not sensitive to overloads or short circuits. For this reason, they must never be used as the sole protection device for a circuit.
Circuits with RCCB protection must always include separate protection against overloads and short circuits. This is most often an MCB, but it could, for example, be a fuse.

·       Like MCBs, RCCBs are available in various different types that are designated by letters. This is a potential source of confusion so it’s worth remembering that a Type B MCB, for example, is not related to a Type B RCCB.
·       RCCB (Residual Current Circuit Breaker)
·        RCBO (Residual Current Breaker with Overcurrent)
·        Pole: 2, 4
·        Tripping current: 6mA, 10mA, 100mA, 300mA, 500mA
·        Standard Rating: 10A, 13A, 16A, 20A, 25A, 32A, 40A, 63A, 80A, 100A, 125A
·        Type: G, S (time tripping can be delay)
·        Class: AC, A (recommended), B (3ph inverter), F (1ph inveter)
·        Example Write-up in the drawing:

The earth fault protection system is designed as below:
·   Each incoming power for DB and SSB up to 100A is protected by RCCB (Residual Current Circuit Breaker).
·   Each incoming power for DB and SSB within 125A and 300A is protected by Earth Leakage Relay (ELR),
·  Each incoming power for DB and SSB above 400A and above is protected by Earth Fault (EF) Protection Relay.
·  As additional protection by client, all the outgoing circuit from the MSB and ESSB must be protected by the Earth Fault (EF) Protection Relay.
·   Refer to Energy Commission (ST), the sensitivity for RCD shall be as following:-
-       All installation (1 phase & 3 phase): 100mA (0.1A)
-       Final switch socket: 30mA (0.03A)
-       Wet area, i.e. toilet & wet kitchen: 10mA (0.01A)

Monday, May 1, 2017

Current Carrying Capacity for Cable

CURRENT CARRYING CAPACITY FOR CABLE

               Current carrying capacity is defined as the amperage a conductor can carry before melting either conductor or insulation. Heat, cause by an electrical current flowing through a conductor, will determine amount of current a cable can handle.  Cables may be seriously damaged, leading to early failure, or their service lives may be significantly reduced, if they are operated for any prolonged periods at temperature above those corresponding to the tabulated current-carrying capacities.

The tabulated current-carrying capacities are based upon an ambient air temperature 30o C. When the surrounding temperature is higher than 30°C, the conductor’s operating temperature will also increase and the current carrying capacity of the conductor will be reduced. For other values of ambient air temperature it is necessary to apply a correction factor (multiplier) to obtain the corresponding effective current-carrying capacity.

The following formula applies.
a)      It =                      In                                                           
                              Ca x Cg x Ci x Ct                              

Iz            the current-carrying capacity of a cable for continuous service, under the particular installation condition concerned
It            the value of current tabulated in this appendix for the type of cable and installation method concerned, for a single circuit in an ambient temperature 30˚C.
Ib            the design current of the circuit, i.e. the current intended to be carried by the circuit in normal service.
In            the nominal current or current setting of the device protecting the circuit against overcurrent
I2            the operating current (i.e. the fusing current or tripping current for the conventional operating time) of the device protecting the circuit against overload
C             a correction factor to be applied where the installation conditions differ from those for which values of current-carrying capacity are tabulated in this appendix. The various correction factors are identified as follows:-
               Ca          for ambient temperature
               Cg          for grouping
               Ci            for thermal insulation
               Ct           for operating temperature of conductor


Determination of the size of cable to be used

Example for EMSB to ESSB-LP

In = 600 A                          
Ca= 0.97 (refer to Table 4C1, IEEE), assuming ambient temperature of 35°C for thermosetting cable)
Cg=0.8 (refer to Table 4B2, IEEE) I, total 3 core cable touching Horizontal/Vertical)
Ci=1.0 (cable not run in enclosed thermal insulation material)
Ct=1.0 (1.45/2=0.725 for BS3036 semi-enclosed fuse)

It  =                 600            
                0.97 x 0.8 x 1 x 1
    = 773.20 A
Referring to Table 4E1A, IEEE for XLPE/PVC cable,  4/1C x 400mm2 cable on tray has a current carrying capacity of 849 A.

Example for ESSB-LP to SUBMAIN NO.5

In = 200 A                          
Ca= 0.97 (refer to Table 4C1, IEEE), assuming ambient temperature of 35°C for thermosetting cable)
Cg=0.8 (refer to Table 4B2, IEEE), total 3 core cable touching Horizontal/Vertical)
Ci=1.0 (cable not run in enclosed thermal insulation material)
Ct=1.0 (1.45/2=0.725 for BS3036 semi-enclosed fuse)

It  =                 200            
                0.97 x 0.8 x 1 x 1
    = 257.73 A

Referring to Table 4E1A, IEEE for XLPE/PVC cable,  4/1C x 95mm2 cable on tray has a current carrying capacity of 341 A.


Lighting Design

LIGHTING DESIGN

Room Index
               The absolute values of room dimensions are not important; it is the relationship between area, parameter and height of the source of light which matters. It is found convenient to describe room proportions in term of room index.

Room Index, k =               LW        
                                                   Hm (L + W)

Where,  L = Length
                W = Width
                Hm = height of luminaries above the working plane

Mounting Height (HM)
               Mounting height usually is the vertical distance between a luminaire and the working plane, but it is sometimes the distance between the luminaire and the floor.

Utilization Factor (UF)
               U.F is the local flux reaching the working plane (or some other specified surface) divided by the total lamp flux. The value of the ratio depends partly on the room size and reflectance.

Light Loss Factor (LLF)
               The ratio of the illuminance provide at some stated time to the initial illuminance i.e after 100 hours. LLF is the product of the lamp lumen maintenance factor (LLMF), the luminaire maintenance factor (LMF) and the room surface maintenance factor (LMF) and the room surface maintenance factor (SRSMF)

Lumens and lumen-hours
               It would strictly be better to say “lumen output” or “total luminous flux” since the lumen measure flow rather the cumulative quantity a lamp which fail after 1100 hours delivering an average flux of 700 lumens has given a light output of 770,000 lumen-hours, but rarely concerned with this and in ordinary way we speak of a “light output” of 700 lumens.

Illuminance
               The illuminance of a surface is a measure of the concentration of light falling on it. To express it in numbers we need unit of light the lumen (lm). Thus we can say that the output of a 18W PLC tube downlight is 1250 lumens or that the recommended illuminance for a particular location is so many lumens per unit area.

Lux
               Illuminance is measured in lumens per square meter “lux”



Example for required Light Quantity
The store measuring 18.5m x 8.4m with 3.85 lamp height is to be provided with an illuminance consistence with good practice.
·        150 LUX requirement
·        Using 2 x 36W Mirror recessed light fitting (5400 lumens)
·        Assume reflectance of the ceiling is 0.5 and walls is 0.3

The first step is to calculate the flux received on the room.
               Flux received      = illuminance x area
                                             = 150 x (18.5 x 8.4)
                                             = 23,310 lumens

The flux which must be installed is such that when multiplied by utilization factor and by the light loss factor the resulting product is equal to the flux received.
               Flux installed x UF x LLF   = 23,310

In absence of special information it is normal to assume the light loss factor to be 0.75. To find the utilization factor we must first work out the room index
Room Index, k   =             LW        
                                                   Hm (L + W)
                                             =     18.5 x 8.4    
                                                  3.85 (18.5 + 8.4)
                                             = 1.5

Turning to the table utilization factor giving values for this type luminaire (Appendix I), for a room index 1.5 and ceiling and wall reflectances of 0.5 and 0.3 respectively we find that the UF is 0.38.
               Installed Flux      =        23,310      
                                                   0.38 x 0.75
                                             = 81,894.74 lumens

               Required quantity of light =    81,894.74 
                                                                     5,400
                                                               = 15.16 Nos.

               Thus the number of Light fitting needed is 16 Nos.
        
In practice, the fast calculation can do as follows:-
              
Quantity of Light Fitting =            Area x Lux          
                                                 Lumens x LLF x UF
                                                            =      (18.5 x 8.4) x 150     
                                                                5400 x 0.75 x 0.38
                                                            = 15.145

                                                            = 16 Nos.

Saturday, October 5, 2013

begitu lama tak update blog ni sbb tersangatlah bz..semoga di berikan kelapangan & kesihatan..insyallah..

Thursday, June 6, 2013

Electrical Installation

A) Electrical Installation
1. Lighting Installation
Stage ini adalah untuk merekabentuk lampu  yang akan dipasang didalam bangunan dari segi kuantiti dan jenis mengikut kesesuaian dan keluasan bilik didalam bangunan ini.

Sebelum kerja merekabentuk dijalankan, kita perlu mengetahui formula dibawah yang berfungsi untuk mengetahui jumlah lampu yang akan dipasang didalam bilik/ruang di dalam bangunan supaya kecerahan yang sesuai dapat dihasilkan selain dari ianya perlu berpandukan piawaian yang ditetapkan.


Nilai keluasan bilik diambil dengan (panjang x lebar) dalam unit meter persegi, m2. Lux pula perlu dirujuk pada table MS 1525 2007 seperi dibawah. Lighting lumens pula boleh dirujuk pada .Specification Data  Sheet' lampu. Nilai Lumens setiap lampu adalah berbeza.


Untuk mengetahui jalan kiraan bagi pengiraan keperluan bilangan lampu ini, ianya dapat ditunjukkan seperti dibawah. Saya akan mengambil satu (1) ruang bilik yang terdapat didalam bangunan ini.

Nama Bilik: Bilik Surgery
Keluasan bilik 16 meter persegi
Lampu: 2 x 18W mirror recessed type (2700 Lumens) 
Lux: 500

Langkah pengiraan di atas perlu diulang untuk setiap bilik bagi membolehkan kuantiti yang ideal dapat dipasang di tapak. Pengiraan awal ini boleh mengelakkan bilik tidak memenuhi keperluan standard pencahayaan yang diperlukan. Untuk memudahkan proses pengiraan ini, anda boleh mencipta jadual sendiri menggunakan 'excell' bagi memudahkan pengiraan yang berulang ini. Contoh format jadual pengiraan lux adalah seperti dibawah.


Kini telah terdapat di dalam pasaran Software bagi pengiraan Lux Level ini dari pengeluar lampu. Contohnya seperti Software DiaLux. Software ini amatlah berguna selain ketepatan, simulasi awal dapat ditunjukkan dalam bentuk gambarajah supaya gambaran awal dapat ditunjukkan kepada pemilik bangunan.

Monday, December 3, 2012

Klinik Pergigian Teluk Wanjah

No.1 - Pengenalan Projek

Projek ini terletak di daerah kota setar, alor setar kedah darul aman. Ini merupakan projek pertama saya yang melibatkan Bangunan Kesihatan (Pergigian). Seperti yang semua maklum, projek-projek yang melibatkan Bangunan Kesihatan merupakan projek yang akan mencabar untuk menyiapkannya.

Setelah mendapat tugasan ini, perkara yang pertama yang perlu di lakukan adakah mengenalpasti lokasi tapak pembinaan ini (Lawatan Tapak). Sebab-sebab utama pergi lawatan tapak adalah:-

1. Membuat 'marking' terhadap servis-servis yang terdapat berhampiran tapak cadangan pembinaan seperti TNB Substation, tiang-tiang TNB, Manhole Telekom JC9/C, JB30, tiang-tiang Telekom, Paip-paip air sediada dan sebagainya.

2. Laporan keadaan tapak perlu dibuat untuk di serahkan kepada pelanggan berkenaan dengan info-info yang di peroleh di tapak. Ini sangat penting kerana ianya mungkin akan melibatkan tambahan dari segi kos projek, contohnya jika kawasan yang agak terpinggir tambahan kos adalah diperlukan untuk pemasangan paip-paip air, saluran telefon, Kabel elektrik dan sebagainya. Dalam kes Klinik Pergigian Teluk Wanjah ini, di dapati terdapat beberapa tiang TNB dan tiang Telekom yang perlu diubah kedudukannya kerana kedudukannya yang berada di atas cadangan tapak pembangunan. Di samping itu, terdapat juga paip air yang perlu di buat pengubahsuaian lokasi. (Rujuk Post saya sebelum ini-Laporan Lawatan Tapak Klinik Teluk Wanjah)

3. Memaklumkan kepada pihak Jurukur Bahan (QS) berkenaan dengan anggaran kos tambahan yang perlu dimasukkan kedalam kontrak iaitu kos pengubahan tiang-tiang elektrik dan telekom sediada serta paip air yang terdapat dalam kawasan cadangan pembinaan. Untuk projek ini, terdapat keperluan untuk tambahan kos pengubahan kedudukan tiang elektrik TNB dan Telekom.

Kebiasaannya, pada masa ini pihak 'Lead Consultant' iaitu Arkitek akan mengadakan Mesyuarat dengan semua pihak iaitu Pengguna (KKM Bahagian Pergigian), Penguasa (KKM Bahagian Projek), Jurutera Struktur, Juruukur Bahan, dan kami selaku Jurutera M&E. Mesyuarat ini bertujuan untuk membincangkan kehendak-kehendak pengguna berkenaan dengan Rekabentuk, Sistem M&E yang perlu ada di dalam Klinik Pergigian ini dan sebagainya.

Bagi Skop M&E, pihak pengguna memerlukan perkara-perkara berikut bagi membolehkan Klinik Pergigian ini dapat beroperasi:-

A) Electrical Installation
1. Lighting Installation
2. Small Power Installation
3. Compound Lighting Installation
4. Lightning Protection Installation
5. Telephone Installation
6. Computer/Data Installation
7. Public Address System
8. SMATV System
9. Card Access System
10. Audio & Visual System for Meeting Room
11. Audio Conference System for Meeting Room
12. QMS System (Queue Management)

B) Mechanical Installation
1. ACMV System (Air-Conditioning & Mechanical Ventilation)
2. Fire Protection System
3. Internal Cold Water System
4. Internal Sanitary System
5. Compress Dry Air System (Medical Type) for Dental Chair
6. Suction System for Dental Chair
7. LPG System

Selepas mendapat info dari pihak pengguna, langkah seterusnya adalah Merekabentuk Sistem M&E untuk dikemukakan kepada KKM (Bahagian Projek) untuk semakan.

Saya akan menerangkan langkah-langkah untuk rekabentuk ini pada 'Post' yang akan datang. Sekian, wslm..




Saturday, November 3, 2012

Laporan Lawatan Tapak Klinik Teluk Wanjah

Date     : 20th May 2010
Time     : 12:30pm
Venue   : Klinik Pergigian Teluk Wanjah, Alor Setar, Kedah.

            After a site visit dated 20th May 2010 at Klinik Pergigian Teluk Wanjah, Alor Setar, Kedah, we hereby pleased to conclude the following matters for kind references:

1)     Electrical Power Supply Infrastructure
i.     From our site visit, we have checked on the existing power supply to existing building (Asrama Doktor Pelatih). The existing power supply was supplied from overhead cable from nearest TNB concrete pole.
ii.     The nearest existing TNB Sub-Station is “Pencawang Elektrik Kompleks Belia Dan Sukan” which is about 600m from our site.
iii.     This existing TNB Sub-Station is a single chamber Sub-Station.
iv.     We believe that the existing Sub-Station is used to supply electrical power only for  “Kompleks Belia Dan Sukan”
v.     For this project, we believe the maximum demand for electrical power supply is more than 120kw which shall require a new TNB Sub-Station.

2)     Telecommunication Infrastructure 
      i.        From our site visit, this existing telephone was supplied from overhead cable from nearby existing telephone pole.
     ii.        This existing building (Asrama Doktor Pelatih) receives many telephone line and the telephone distribution to building was not properly done.
    iii.        We would like to suggest a proper underground telephone incoming with proper distribution plan for telephone, fax and internet facilities.

3)     Street Lighting Facilities
      i.        From our site visit, there is no existing street lighting in the Asrama Doktor Pelatih at the existing service road on our site.
     ii.        We would need to provide Street Lighting services as it would be one of “Majlis Daerah” requirement for new development.

4)     Compound Lighting Facilities
      i.        From our site visit, the existing compound lighting is installed at compound area which is located at compound area and mounted on an existing building.
     ii.        We would like to suggest replacing the compound lighting to a proper position.


5)     Incoming water supply
      i.        From our site visit, the incoming water supply is located at 2nd main entrance at a back of existing building.
     ii.        The incoming water supply pipe is 110mm HDPE.
    iii.        The location of bulk meter can be maintained and can use for temporary water supply for the construction.


The following Figure 1 shows the location of “TAPAK CADANGAN” Klinik Pergigian Teluk Wanjah and existing TNB single chamber for Kompleks Belia & Sukan. This existing TNB Sub-Station is located in the Kompleks Belia & Sukan compound.


FIGURE 1: LOCATION PLAN “KLINIK PERGIGIAN TELUK WANJAH”

 
FIGURE 2: EXISTING TNB SINGLE CHAMBER SUBSTATION FOR “KOMPLEKS BELIA & SUKAN”





FIGURE 3: NEAREST TNB POLE FOR POWER SUPPY


Telecommunication Infrastructure 
Figure 4 shows the existing Telekom incoming overhead cable from nearby Telekom pole and figure 5 shows existing Telekom manhole type JC9/C.


FIGURE 4: EXISTING TELEKOM INCOMING OVERHEAD CABLES


FIGURE 5: EXISTING TELEKOM MANHOLE TYPE JC9/C


Street Lighting Facilities
There are still no street lighting facilities available at a main entrance of existing Asrama Doktor Pelatih. We have noticed that the street lighting facilities is only been provided until “Pusat Latihan Lanjutan” as shown in figure 6.




FIGURE 6: EXISTING STREET LIGHTING


Compound Lighting Facilities
Figure 7 shows the existing Compound Lighting provide at compound area and mounted at building.


FIGURE 7: EXISTING COMPOUND LIGHTING



Water Supply Facilities

The following Figure 8 shows the location of existing bulk meter for water supply location. 




 

FIGURE 8: EXISTING INCOMING WATER SUPPLY